Repository logo
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Log In
New user? Click here to register.Have you forgotten your password?
  1. Home
  2. IIT Gandhinagar
  3. Electrical Engineering
  4. EE Publications
  5. Optimising power despatch: security constrained economic despatch initiative in Gujarat
 
  • Details

Optimising power despatch: security constrained economic despatch initiative in Gujarat

Source
11th International Conference on Power Systems (ICPS 2025)
Date Issued
2025-12-07
Author(s)
Sharma, Divya
Bhatt, Vatsalkumar
Dilipkumar, Pandya Darshan
Pindoriya, Naran M.  
Patel, Utpal
Darji, Chetan
Rathod, A. B.
Bhuva, Kanti
DOI
10.1109/ICPS67276.2025.11364965
Abstract
The efficient, economic, and reliable operation of power systems is crucial for ensuring reliable electricity supply to the end users. As power system is evolving with increasing renewable energy integration, network complexity, and the need for real-time operational security, there is growing interest in upgrading existing despatch practices such as merit order despatch through advanced optimization techniques. Security constrained economic despatch (SCED) for state load despatch centres (SLDCs) is a complementary approach to support the transition towards smart, secure, and optimized power system operations. SCED incorporates all types of constraints like transmission constraints, generating unit constraints- declared capacity, technical minimum, ramp-up and ramp-down limits, etc. This work describes the SCED implementation for SLDC Gujarat from 15.06.2025-15.07.2025, for day-ahead and first window of real-time generation scheduling to take decision about the amount and price of power to be acquired from the electricity market. The optimization problem is formulated as linear programming to minimize the operational cost, respecting generating unit constraints (declared capacity, technical minimum, ramp-up, and ramp-down). The simulation study is carried out using the CPLEX solver in the GAMS software.
Unpaywall
URI
https://repository.iitgn.ac.in/handle/IITG2025/34620
Subjects
Grid security
Linear programming
Merit order despatch
Optimization
Security constrained economic despatch
State load despatch centre Gujarat
Smart grid
IITGN Knowledge Repository Developed and Managed by Library

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify